Macromedia Flash Plugin Required.

 

Current Projects:

  • Lotus Glen Correctional Facility
  • Cairns Cleaner Seas
  • Nikenbah Waste Water Treatment Plant
  • Gateway Upgrade
  • Lavarack Barracks Upgrade
  • North South Bypass Tunnel
  • QR Limited Security Upgrade




Australian Industry Group

Australian Department of Defence Recognised Supplier

Trimod PDF Brochure

PRICE ENQUIRY

Trimod

MetaSystem has developed a ground-breaking and unique project. It’s TRIMOD®, the UPS with 8, 10, 16, 20, 30, 45 and 60 kVA power ratings that can adapt immediately to the changing needs of the loads it protects: more power, longer autonomy, redundancy. In actual fact, the concepts on which the TRIMOD® projects are based are modularity, expandability, redundancy: concepts which, besides assuring the utmost reliability, also guarantee considerable savings from the economic aspect.